Probe Mines work at Mcfauld’s lake completed
Probe Mines Limited (TSX VENTURE:PRB) announced that the Phase II diamond drilling on the Probe-Noront Resources (TSX VENTURE:NOT) Joint Venture Project’s Black Creek high-grade chromite discovery in the McFauld’s Lake area of the James Bay Lowlands has been successfully completed.
The press release is quoted as saying
The McFauld’s area continues to receive considerable attention with recent reports of high-grade chromite and PGE mineralization from Noront and Freewest Resources, in addition to continuing intersections of high-grade nickel and copper at Noront’s Eagle One, Eagle Two and AT-12 discoveries. A preliminary economic assessment of the Eagle One Ni-Cu deposit reported an estimated resource (indicated) of 1,834,000 tonnes averaging 1.96% Ni, 1.18% Cu and 5.1g/t combined platinum, palladium and gold.